STORMHOLTADVISORY
Energy · WORKSTREAM

Improvement across drilling operational stages

Oil & Gas major · Within UK Wells experience

Visible connections through a transparent layered system
← Back to the case library

The challenge

The V122 Shearwater workstream covered making hole, running casing and cementing. These operational stages made it a distinct improvement area within the UK Wells experience, separate from marine logistics, equipment operations and the subsea development campaign. The case identifies the working scope while preserving technical project confidentiality.

The contribution

Jeroen contributed to V122 Shearwater operations improvement involving the Oil & Gas major, Schlumberger and Valaris. His project experience specifically includes the three operational stages, establishing the boundaries of this workstream within the wider Wells improvement portfolio.

The documented result

The work contributed to improvement across the identified drilling stages. A separate public before-and-after measure or numerical benefit was not reported.

This is a distinct workstream within a wider engagement. Artwork is conceptual and does not depict the client’s facilities or project. Based on Jeroen van Koesveld’s professional case documentation. This account presents the industry context and documented contribution.

Explore the relevant capability

Performance improvement ↗

Related experience

Executive performance reviews for process excellence ↗

Kanban and visible work for project teams ↗

Relevant to your organisation?

Discuss how the approach could apply to your own operating challenge.

Discuss a similar challenge ↗